Your position:

solar street light (HS-X series)

Solar street lights are composed of solar photovoltaic panels, street lights, and batteries, and are divided into integrated street lights and split street lights.
Share to:
Half-cut Pv Module
PV Module
Small PV Module
Other Products
Description
Products & Company



Parameter | Watt

HS-20W
 
HS-40W
 
HS-60W
 
HS-80W
 
HS-100W
 
HS-120W
Solar panel Max power
18V/30W
18V50W
18V70W
18V100W
18V130W
18V130W
LED Max power
12.V 20W
12.V 40W
12.V 60W
12.V 80W
12.V 100W
12.V 120W
N.W
4.2KG
9.0KG
12.6KG
17.8KG
28.5KG
28.6KG
Unit size(mm)
530*320*70
930*320*135
1150*325*145
1150*450*135
1469*420*395
1469*420*395
carton size(mm)
580*360*140
950*360*210
1190*360*220
1190*490*220
1530*130*520
1530*130*520
GW.for carton:
5.4KG
10.8KG
14.5KG
19.8KG
33.3KG
33.3KG
20GP container:
1030pcs
400pcs
295pcs
295pcs
155pcs
155pcs
CRI
>70Ra
LED Life time
50000hours
Lumen (LM)
130-140lm/w
Working TEMP( )
 -20~+75℃(-4℉~167℉)
Led chip brand
High light efficiency 3030 lamp bead




Exhibition & Certificate

Question 1. : Can I have a sample order for solar panel?

Answer 1. : Sure, we are glad to provide solar panel samples for customer to make a test to check the quality.

Question 2. : How long is the warranty of your solar panel?

Answer 2. : We provide 10 year product warranty and 25 year linear performance warranty for our solar panels. 

Question 3. : Which country you mainly export to?

Answer 3. : More than 80% of our solar panels are exported. And we have exported mainly to Japan, Turkey, Pakistan, Brazil, India, Argentina and so on. We sincerely welcome customer from all over the world to visit our factory and witness our full-automatic solar panel production line.

Question 4. : How about the lead time of your solar panel?

Answer 4. : Normally we do have stocks, thus we can arrange for shipment within 7 days. But if you have special requirements or big quantity, we would have to produce accordingly. And we can produce about 450 PCS of solar panels per day. That is the lead time would be very favorable.

Industry average
JAM6-60/SI
2
3.5% lower
Transportation costs
2
3% lower
Land costs
2
2% lower
Installation costs
2
1% lower
Bos costs
EC Standard Test
Thermal cycling,200 cycles
Damp heat 1000 hours
UV 15KWH
Humidty freeze 10 cycles
Hot spot endurance 5 hours
x3
EC Standard Test
Thermal cycling,200 cycles
Damp heat 1000 hours
UV 15KWH
Humidty freeze 10 cycles
Hot spot endurance 5 hours
Inquiry
Please feel free to submit your inquiry information to us. We will contact with you as soon as possible.
* Your Name:
Your Country:
* Your Email:
Your Telephone:
Your Company:
* Inquiry:
send message